solarice
Ex. Club Member
Bit of a delay getting it started lets just say it was a part issue, not my fault though lol.
anyways fuel tank is now in, the "plumbing" for the sc control has arrived and is now fitted (fingers crossed it works ok)...heat shields are partially fitted as i need to fit my gear lever return spring on.
also need to get some gearbox oil and brake fluid (forgot about them :S) oh and some petrol and then we can start it up...project will be about 40% complete by that point.
anyways fuel tank is now in, the "plumbing" for the sc control has arrived and is now fitted (fingers crossed it works ok)...heat shields are partially fitted as i need to fit my gear lever return spring on.
also need to get some gearbox oil and brake fluid (forgot about them :S) oh and some petrol and then we can start it up...project will be about 40% complete by that point.