» CMF Memberanother interior project finished. thought i would share it with you. the idea was a 10 switch console and 4 new gauges installed.
step 1) to look were the switch panel is going. design it, cut the design out of MDF. drill the holes were it will be screwed through, plus the holes for the switches, dont rush, presise measurment is essential if you want it looking good. sand it. then apply:
2 coats of prime
2 coats of base coat (actual colour you will see) and finaly
2 coats of laquer
leave 24hrs to dry through each of the 3 stages of spraying the pannel.
step 1) to look were the switch panel is going. design it, cut the design out of MDF. drill the holes were it will be screwed through, plus the holes for the switches, dont rush, presise measurment is essential if you want it looking good. sand it. then apply:
2 coats of prime
2 coats of base coat (actual colour you will see) and finaly
2 coats of laquer