CMF_fred
» CMF Memberslowly.... painted water intercooler, Piping, Cam cover gloss black... Mounted new water pump under battery. routed hoses... Things left to do remount a/c-intercooler radiators connect new plumping make the pump controller find/make a rubber boot to cover the pump motor and throw in the turbo... i want to redo the turbo head shield, so maybe in the next few days I'll be turbo'd. Pix to come... and thats stage 1.. stage 2:mapped water injection, stage 3:the electronics........ (boost controller, n14 AFN pre-turbo, simple traction control, fully programmable ignition with knock retard, new instrumentation)