Whats required!
Gearbox replacement
1.00 Onto axle stands, chock rear wheels, remove NSF wheel, 15.00
2.00 Remove offside strut , drain g box oil + remove driveshaft 15.00
3.00 Remove battery and tray 8.00
4.00 Disconnect clutch cable 6.00
5.00 Remove speedo drive fit broom wood into diff 10.00
6.00 Disconnect neutral/reverse switch 5.00
7.00 Disconnect earth lead 4.00
8.00 Remove g change link 8.00
8.00 Remove splash guard + Support pressing 8.00
9.00 Remove starter bolts and hang 3.00
10.00 Remove g/box mount - support wood/jack 10.00
11.00 Remove rear engine mount 20.00
12.00 Undo bellhousing bolts 10.00
13.00 Remove gearbox-dowels at 3 and 9 oclock 10.00
14.00 Replace gearbox - grease shaft/dowels 20.00
15.00 Replace belhousing bolts 12.00
16.00 Reconnect clutch cable + test 8.00
17.00 Reconnect eng mounts + support pressings 30.00
18.00 Reconnect g box mounts 10.00
19.00 Replace starter motor 10.00
20.00 Recon neutral and rev switches-side + back of gearbox+Top + connection bolted to top 6.00
21.00 Reconnect earth lead 5.00
22.00 Refit drive shafts + struts 20.00
23.00 Reconnect g-change link 5.00
24.00 Fill g/box + replace speedo drive 20.00
25.00 Replace splash guards 5.00
26.00 Replace battery, tray and electrics 12.00
27.00 Replace bumber and lights 40.00
28.00 Replace wheels + take off axle stands 12.00
347.00
Forget the wood into diff when removing, but put a piece into the new one so that it does not fall apart!