• Please only use these forums for blogs, they are not a discussion forum

Reply to thread

Last i decided that I wanted a break from the lathe, I do spend all day running a CNC lathe. lol.


however I ended up sorting through the wiring loom and highlighting the wiring diagram. should be fairly straight. forward with some luck.


also formulated an epic plan for the and just need some frank spec araldite. Tonight ill have the inlet and and airbox all finished. Then its time to pull the motor and strip it down, ready for a parcel from frank :D


With any luck I should be putting it all back together within a couple weeks.


Iam waiting for:


Cga valves

Qg red injectors

Uprated head gasket (probably cosworth mhg, as 1 of my sponsors is a dealer)

Rings

Acl bigend bearings

Ga airbox


More later :)


Back
Top