Last i decided that I wanted a break from the lathe, I do spend all day running a CNC lathe. lol.
however I ended up sorting through the wiring loom and highlighting the wiring diagram. should be fairly straight. forward with some luck.
also formulated an epic plan for the and just need some frank spec araldite. Tonight ill have the inlet and and airbox all finished. Then its time to pull the motor and strip it down, ready for a parcel from frank 
With any luck I should be putting it all back together within a couple weeks.
Iam waiting for:
Cga valves
Qg red injectors
Uprated head gasket (probably cosworth mhg, as 1 of my sponsors is a dealer)
Rings
Acl bigend bearings
Ga airbox
More later 